✨ New Arrivals Just Dropped!Explore
14K Yellow Gold Plated .925 Sterling Silver 1/2 Cttw Round Miracle-Set Diamond S-Curve Tennis Bracelet (I-J Color, I3 Clarity) - 7"
HomeStore

14K Yellow Gold Plated .925 Sterling Silver 1/2 Cttw Round Miracle-Set Diamond S-Curve Tennis Bracelet (I-J Color, I3 Clarity) - 7"

14K Yellow Gold Plated .925 Sterling Silver 1/2 Cttw Round Miracle-Set Diamond S-Curve Tennis Bracelet (I-J Color, I3 Clarity) - 7"

$664.65

Original: $1,899.00

-65%
14K Yellow Gold Plated .925 Sterling Silver 1/2 Cttw Round Miracle-Set Diamond S-Curve Tennis Bracelet (I-J Color, I3 Clarity) - 7"

$1,899.00

$664.65

The Story

The pinnacle of high style, this fascinating tennis bracelet dazzles with round diamonds designed with a unique, stone enhancing miracle plate setting. A polished 14k yellow gold plated .925 sterling silver wraps the diamonds in a poised beauty that serves to enhance the diamond's natural beauty. The look concludes with a functional box clasp for secure wearing. The diamonds are a total 1/2 cttw and are of an approximate I-J color and I3 clarity. This bracelet is 7 inches long, best for small and medium sized wrists.

Specifications:

Birthstone Month 1 (Primary): April
Bracelet Clasp Type: Box Clasp with Latch
Bracelet Length (in): 7
Color Code: T
Combined Dimensions: 177 x 5 x 3
Design Style: S-Curve Tennis Bracelet
Diamond 1 Clarity: I3
Diamond 1 Color: I-J
Diamond 1 Count: 38
Diamond 1 Cut: Very Good
Diamond 1 Origin: Natural
Diamond 1 Setting: Miracle
Diamond 1 Shape: Round
Diamond 1 Total Weight: 0.51
Diamond 1 Treatment: None
Diamond 1 Weight: 0.0134210526
Diamonds (Yes/No): Yes
Gemstone (Yes/No): No
Gender: Women
H (mm): 3
Karat/Purity/stamp: .925
L (mm): 177
Material 1: Sterling Silver.14K Gold
Material 2: Diamonds
Necklace Chain Material: Y
Plated?: Yes
Plating Type: Micron - 2
Size: 0.51
Size: 7
Total Diamond Quantity: 38
W (mm): 5
14K Yellow Gold Plated .925 Sterling Silver 1/2 Cttw Round Miracle-Set Diamond S-Curve Tennis Bracelet (I-J Color, I3 Clarity) - 7" - Image 2

Details & Craftsmanship

Every detail has been carefully considered to bring you the perfect product.

14K Yellow Gold Plated .925 Sterling Silver 1/2 Cttw Round Miracle-Set Diamond S-Curve Tennis Bracelet (I-J Color, I3 Clarity) - 7" - Image 3

Details & Craftsmanship

Every detail has been carefully considered to bring you the perfect product.

14K Yellow Gold Plated .925 Sterling Silver 1/2 Cttw Round Miracle-Set Diamond S-Curve Tennis Bracelet (I-J Color, I3 Clarity) - 7" - Image 4

Details & Craftsmanship

Every detail has been carefully considered to bring you the perfect product.

14K Yellow Gold Plated .925 Sterling Silver 1/2 Cttw Round Miracle-Set Diamond S-Curve Tennis Bracelet (I-J Color, I3 Clarity) - 7" - Image 5

Details & Craftsmanship

Every detail has been carefully considered to bring you the perfect product.

14K Yellow Gold Plated .925 Sterling Silver 1/2 Cttw Round Miracle-Set Diamond S-Curve Tennis Bracelet (I-J Color, I3 Clarity) - 7" - Image 6

Details & Craftsmanship

Every detail has been carefully considered to bring you the perfect product.

Description

The pinnacle of high style, this fascinating tennis bracelet dazzles with round diamonds designed with a unique, stone enhancing miracle plate setting. A polished 14k yellow gold plated .925 sterling silver wraps the diamonds in a poised beauty that serves to enhance the diamond's natural beauty. The look concludes with a functional box clasp for secure wearing. The diamonds are a total 1/2 cttw and are of an approximate I-J color and I3 clarity. This bracelet is 7 inches long, best for small and medium sized wrists.

Specifications:

Birthstone Month 1 (Primary): April
Bracelet Clasp Type: Box Clasp with Latch
Bracelet Length (in): 7
Color Code: T
Combined Dimensions: 177 x 5 x 3
Design Style: S-Curve Tennis Bracelet
Diamond 1 Clarity: I3
Diamond 1 Color: I-J
Diamond 1 Count: 38
Diamond 1 Cut: Very Good
Diamond 1 Origin: Natural
Diamond 1 Setting: Miracle
Diamond 1 Shape: Round
Diamond 1 Total Weight: 0.51
Diamond 1 Treatment: None
Diamond 1 Weight: 0.0134210526
Diamonds (Yes/No): Yes
Gemstone (Yes/No): No
Gender: Women
H (mm): 3
Karat/Purity/stamp: .925
L (mm): 177
Material 1: Sterling Silver.14K Gold
Material 2: Diamonds
Necklace Chain Material: Y
Plated?: Yes
Plating Type: Micron - 2
Size: 0.51
Size: 7
Total Diamond Quantity: 38
W (mm): 5